Implemented projects:

  1. Thermal power plant of 5.9 MW capacity, working on wood wastes, wood chips. The plant worked in Germany less than 20 000 hours. Generator - SIEMENS.
    Steam boiler with the capacity of 26 tons of steam per hour with a pressure of 4.2 MPa, steam temperature 420 C. Annual power output 47 000 000 KW/h.

  2. Combined heat and power plant with a capacity of 8.6 MW, operating on sunflower husk. 2 generators TWIN and TANDEM are installed. The plant worked in Germany less than 20 000 hours. Annual power output - 60 000 000 KW/h.

  3. Thermal power plant with a capacity of 12.5 MW, working on wood wastes, wood chips. The plant worked in Germany less than 20 000 hours.